Grand Rapids Water Resource Recovery Facility

Grand Rapids Water Resource Recovery Facility Location: Grand Rapids, MI Contract: Design Assist OVERVIEW Project Summary​ Phase 1: Biodigestion with CHP  The new Grand Rapids Water Resource Recovery Facility pioneers sustainable infrastructure with its cutting-edge Biodigestion project and Combined Heat and Power (CHP) technology. This innovative facility treats wastewater while generating renewable energy by converting […]

Michigan State University Research Center

MSU Research Center Location: Grand Rapids, MI Contract: Design Assist OVERVIEW Project Summary​ This new Biomedical Research Building spans an impressive 162,000 square feet across 7 stories and houses cutting-edge Science Labs, Classrooms, and Offices, providing a dynamic environment for research and collaboration. Navigating the challenges of a congested urban area, the project was meticulously […]

Western Michigan University College of Engineering & Applied Sciences

WMU College of Engineering & Applied Sciences Location: Kalamazoo, MI Contract: Fully Designed & Engineered OVERVIEW Project Summary​ Situated at the core of WMU’s Parkview Campus, the College of Engineering and Applied Sciences boasts a sprawling 343,000-square-foot structure, completed in the autumn of 2003. This $72.5 million state-of-the-art academic edifice stands as the university’s largest, […]

Grand Valley State University Kindschi Hall of Science

GVSU Kindschi Hall of Science Location: Allendale, MI Contract: Fully Designed & Engineered OVERVIEW Project Summary​ Using Building Information Modeling (BIM), Allied Mechanical Services was able to prefabricate 80% of the piping and pre-determine 98% of hanger points. This helped reduce the time of a campus-wide shutdown as well as reduce installation time and waste […]

Spectrum Health Blodgett Addition

Spectrum Health Blodgett Location: Grand Rapids, MI Contract: Fully Designed & Engineered OVERVIEW Project Summary​ The expansion at Blodgett Hospital in East Grand Rapids encompassed three new patient floors, one OR/Recovery Floor, and a new basement area housing essential utilities. This basement area facilitated the installation of eight new air handlers, piping, and ductwork, connecting […]

Holland Hospital

Holland Hospital Location: Holland, MI Contract: Fully Designed & Engineered OVERVIEW Project Summary​ This project encompassed the construction of a new Emergency Department, Critical Care building, and substantial renovation of existing mechanical systems across various sections of the hospital. Spanning a three-year timeline, the expansions and upgrades aimed to enhance healthcare delivery within the facility. […]

Mercy Health Muskegon

Mercy Health Location: Muskegon, MI Contract: Design Assist OVERVIEW Project Summary​ AMS successfully completed a phased hospital renovation spanning 154,000 sq. ft. and a multi-story project for a science lab, classrooms, and offices covering 160,000 sq. ft. Despite challenges in a congested urban area, AMS managed to keep the project within the original budget. Notably, […]

Perrigo Chilled Water

Perrigo Chilled Water Location: Holland, MI Contract: Fully Designed & Engineered OVERVIEW Project Summary​ This project consisted of installing a new chiller and cooling tower, as well as the installation of the mechanical room chilled water, condenser water and 10 hydronic pumps. Allied Mechanical Services utilized Building Information Modeling (BIM) on 95% of the piping, […]

Ottawa County Family Justice Center

Ottawa County Family Justice Center Location: West Olive, MI Contract: Design Build OVERVIEW Project Summary​ The Ottawa Family Court Facility was constructed using the integrated project delivery (IPD) method. The facility spans 57,200 square feet over three stories, housing general office space, security holding cells, and six court/hearing rooms, consolidating family services for Ottawa County. […]

Fair Life Milk

Fairlife Milk Location: Coopersville, MI Contract: Fully Designed & Engineered OVERVIEW Project Summary​ The project’s scope included establishing a new boiler plant, chiller plant, and deploying utilities and process lines to equipment. In response to the owner’s request to expedite the schedule by six months, Allied Mechanical Services (AMS) was committed to meeting the accelerated […]