Prefabrication

AMS began prefabricating piping systems for its own use in 1991 while working at a local chemical and pharmaceutical plant. It has become a way of life for AMS on all of its projects since then.

Prefabrication of piping systems allows a contractor to concentrate on field installation while the fabrication is done in a controlled environment. Prefabrication results in a significant increase in efficiency and quality while enhancing the project schedule by allowing accurate prefabrication of sub-assemblies for completion and staging – all while necessary preliminary work at the site is underway. Typically, shop efficiencies offset any perceived increase in a project’s total cost. 

QUALIFICATIONS

  • ASME – R Stamp R-313
  • ASME – PP Stamp – #24882
  • ASME – U Stamp – #313
  • Various other ASME Welding Qualifications
  • Materials Welded – Carbon Steel, Stainless Steel, Hastelloy, Iconel, and other Alloys 

FABRICATION FACILITY

  • Over 220,000 sq-ft of Fabrication Area
  • 8 Overhead Cranes
  • Protem CTA Cutting/Beveling
  • Rotoweld 3000
  • 3 – Orbital Welding Machines to 6” Capacity
  • Plasma Cutting Table
  • CAD/BIM Capabilities
  • 3D Scanning
  • Blasting/Painting Capabilities

PIPE FABRICATION FOR FOLLOWING SERVICES

  • Steam/Condensate – High Pressure to Low Pressure
  • Clean Steam – Clean Room Environments
  • Water/Waste Water Treatment
  • Compressed Air
  • Lethal Services – 100% Radiograph
  • Chemical Piping
  • Solvents
  • Hydraulic Piping