Michigan State University Water Treatment Plant

MSU Water Treatment Plant Location: East Lansing, MI Contract: Fully Designed & Engineered OVERVIEW Project Summary This project included constructing a new filtration plant and a 160-foot water storage tower to improve water quality by removing minerals like iron. The project aimed to enhance the taste and appearance of water drawn from south campus groundwater […]
Western Michigan University Student Center Dining Facility

WMU Student Center Dining Facility Location: Kalamazoo, MI Contract: Fully Designed & Engineered OVERVIEW Project Summary The new 162,000-square-foot building, designed specifically for student needs, spans three floors. It replaces the Bernhard Center, constructed in 1957, and houses a variety of amenities, including restaurants, retail spaces, meeting rooms, and offices. Explore Other Projects Michigan State […]
Zoetis Building 248

Zoetis – Building 248 Location: Kalamazoo, MI Contract: Design Assist OVERVIEW Project Summary Given a 6-month completion schedule, Allied Mechanical Services utilized BIM and prefabrication to start the welded process piping fabrication at the same time underground plumbing was beginning on site. Originally over budget, the project endured thirteen value engineered deductions in a project […]
South Christian High School

South Christian High School Location: Byron Center, MI Contract: Design Assist OVERVIEW Project Summary Our involvement in the construction of this new high school encompassed the installation of mechanical piping for heating hot water systems, chilled water systems, natural gas mains, and snowmelt piping. We prioritized completing the chilled water system by summer 2018 to […]
Graphic Packaging International

Graphic Packaging International Location: Kalamazoo, MI Contract: Design Assist OVERVIEW Project Summary This $600M state-of-the-art paper plant, known as the Graphics Package Bronco Project, was built from scratch, with construction starting in September 2019 and the first product produced in January 2022. Expected to yield 500,000 tons annually, it’s the largest project in Kalamazoo in […]
Gerald R. Ford International Airport Central Utilities Plant – Phase 2

Gerald R. Ford International Airport Central Utilities Plant – Phase 2 Location: Grand Rapids, MI Contract: Design Assist OVERVIEW Project Summary Project Elevate GRFIA Central Utilities Plant – Phase 2 was the addition of a new building to house the three new main 870-ton chillers which provide cooling to the entire airport facility including the […]
Grand Valley State University Fieldhouse Air Conditioning Unit

GVSU Fieldhouse Air Conditioning Unit Location: Allendale, MI Contract: Fully Designed & Engineered OVERVIEW Project Summary The project involved the replacement of two existing heating-only air handling units with two new 40,000 CFM air handling units, equipped with air conditioning and dehumidification capabilities for the arena. Allied Mechanical Services utilized prefabrication for efficiency, carefully coordinating work […]
One Haworth Center

One Haworth Center Location: Portage, MI Contract: Design/Build OVERVIEW Project Summary The Haworth project was awarded through a lump sum design/build bidding process involving prequalified bidders, with a fixed project duration of two years and no price escalation. It entailed the complete removal of the existing building facade, the addition of an atrium, and the […]
Donald K. Shine Water Treatment Plant

Donald K. Shine Water Treatment Plant Location: Wyoming, MI Contract: Design Build OVERVIEW Project Summary The Donald K. Shine Water Treatment Plant Expansion Phase 1A marked the initial stage of a significant expansion project for the Wyoming Water Treatment Plant. It included the installation of two new large diesel generators housed in a new building […]
City of Wyoming Clean Water Plant

City of Wyoming Clean Water Plant Location: Wyoming, MI Contract: Fully Designed & Engineered OVERVIEW Project Summary The project entailed a significant expansion and rehabilitation of the Wyoming Clean Water Plant Aeration facilities, carried out while ensuring uninterrupted facility operation through close coordination with the City of Wyoming. The new Aeration facility featured five 500 […]