Zoetis Building 248

Zoetis – Building 248 Location: Kalamazoo, MI Contract: Design Assist OVERVIEW Project Summary​ Given a 6-month completion schedule, Allied Mechanical Services utilized BIM and prefabrication to start the welded process piping fabrication at the same time underground plumbing was beginning on site. Originally over budget, the project endured thirteen value engineered deductions in a project […]

South Christian High School

South Christian High School Location: Byron Center, MI Contract: Design Assist OVERVIEW Project Summary​ Our involvement in the construction of this new high school encompassed the installation of mechanical piping for heating hot water systems, chilled water systems, natural gas mains, and snowmelt piping. We prioritized completing the chilled water system by summer 2018 to […]

Graphic Packaging International

Graphic Packaging International Location: Kalamazoo, MI Contract: Design Assist OVERVIEW Project Summary​ This $600M state-of-the-art paper plant, known as the Graphics Package Bronco Project, was built from scratch, with construction starting in September 2019 and the first product produced in January 2022. Expected to yield 500,000 tons annually, it’s the largest project in Kalamazoo in […]

Gerald R. Ford International Airport Central Utilities Plant – Phase 2

Gerald R. Ford International Airport Central Utilities Plant – Phase 2 Location: Grand Rapids, MI Contract: Design Assist OVERVIEW Project Summary​ Project Elevate GRFIA Central Utilities Plant – Phase 2 was the addition of a new building to house the three new main 870-ton chillers which provide cooling to the entire airport facility including the […]

One Haworth Center

One Haworth Center Location: Portage, MI Contract: Design/Build OVERVIEW Project Summary​ The Haworth project was awarded through a lump sum design/build bidding process involving prequalified bidders, with a fixed project duration of two years and no price escalation. It entailed the complete removal of the existing building facade, the addition of an atrium, and the […]

Grand Rapids Water Resource Recovery Facility

Grand Rapids Water Resource Recovery Facility Location: Grand Rapids, MI Contract: Design Assist OVERVIEW Project Summary​ Phase 1: Biodigestion with CHP  The new Grand Rapids Water Resource Recovery Facility pioneers sustainable infrastructure with its cutting-edge Biodigestion project and Combined Heat and Power (CHP) technology. This innovative facility treats wastewater while generating renewable energy by converting […]

Michigan State University Research Center

MSU Research Center Location: Grand Rapids, MI Contract: Design Assist OVERVIEW Project Summary​ This new Biomedical Research Building spans an impressive 162,000 square feet across 7 stories and houses cutting-edge Science Labs, Classrooms, and Offices, providing a dynamic environment for research and collaboration. Navigating the challenges of a congested urban area, the project was meticulously […]

Grand Valley State University Kindschi Hall of Science

GVSU Kindschi Hall of Science Location: Allendale, MI Contract: Fully Designed & Engineered OVERVIEW Project Summary​ Using Building Information Modeling (BIM), Allied Mechanical Services was able to prefabricate 80% of the piping and pre-determine 98% of hanger points. This helped reduce the time of a campus-wide shutdown as well as reduce installation time and waste […]

Mercy Health Muskegon

Mercy Health Location: Muskegon, MI Contract: Design Assist OVERVIEW Project Summary​ AMS successfully completed a phased hospital renovation spanning 154,000 sq. ft. and a multi-story project for a science lab, classrooms, and offices covering 160,000 sq. ft. Despite challenges in a congested urban area, AMS managed to keep the project within the original budget. Notably, […]

Perrigo Chilled Water

Perrigo Chilled Water Location: Holland, MI Contract: Fully Designed & Engineered OVERVIEW Project Summary​ This project consisted of installing a new chiller and cooling tower, as well as the installation of the mechanical room chilled water, condenser water and 10 hydronic pumps. Allied Mechanical Services utilized Building Information Modeling (BIM) on 95% of the piping, […]